How to find the specifications for the installation position of the meter box (ready board)?
Most of the meter box (ready board) and switch cabinets of residential buildings are set on the front wall, side wall and side wall of the stair platform. Due to the weak seismic performance of the staircase, when the specification of the meter box (ready board) is too large or too many, the wall will basically become a part load infilled wall. If you are not careful, it will affect the reliability of the building structure and the installation of equipment.
The power supply bureau generally considers the convenience of meter reading and stipulates centralized layout. However, this regulation has a large space and is a consumption for customers. Therefore, in the actual project, the meter position of the meter box (ready board) can be determined according to the number of each floor and the loading space, and then one meter box (ready board) can be allocated every three or four floors. Use multi meter meter box (ready board), such as 12 meter transparent meter box (ready board).
Centralized installation of meter box (ready board)es is unscientific, affecting the use space and senses, and consuming raw materials and increasing costs. It can be considered to set the meter box (ready board) in layers, but the setting of each layer is too frequent, which brings great difficulty to the meter reading work. Therefore, it is generally set in the section of each module, for example, the four layers of each module are a section.
To sum up, the installation of the meter box (ready board) shall be carried out in the order of power supply acceptance and transfer, installation cost and convenient meter reading.