Earthing standard of Ready Board with Bulkhead Light manufacturer
Ready Board with Bulkhead Light manufacturers have always set high standards for product quality. While ensuring the quality of the Ready Board with Bulkhead Light, the safety is also improving. Precautions for earthing and Neutraling of Ready Board with Bulkhead Light are as follows:
1. The earthing "bus" (earthing bar, PE bar) in the Ready Board with Bulkhead Light is directly connected to the power earthing or earthing system;
2. The Ready Board with Bulkhead Light itself should be processed with "Ready Board with Bulkhead Light earthing bolt" (with PE mark), and the bolt must be connected with the PE bar that has been grounded with copper core wire or special braided wire;
3. The metal conduit connected to the Ready Board with Bulkhead Light must also have a reliable electrical connection with the Ready Board with Bulkhead Light (simple galvanized round steel and flat steel can be welded)
4. The electrical components that must be grounded in the Ready Board with Bulkhead Light must also be connected to the PE row:
5. All earthing wires that need to be distributed in the circuit are taken out by the PE line.
6. The manufacturer of the Ready Board with Bulkhead Light explained that the earthing of the Ready Board with Bulkhead Light shell is to protect the metal part of the Ready Board with Bulkhead Light from electric shock caused by electric leakage or electric shock.
7. At the power supply voltage level, equipment with low voltage and safety voltage lower than 36 volts does not need to be grounded, that is, it is not connected to the housing or connected to Neutral.
8. Neutral adjustment is actually connecting the Neutral line to the equipment shell or directly re earthing.