Do you know how to fix the Ready Board?

Publish Time: Author: Site Editor Visit: 553

Now the Ready Board has been widely used, and its installation needs to adapt to different walls, but it should be noted that the fixing methods of the Ready Board manufacturer are different on different walls.

 

1. When the Ready Board is fixed on the protective wall of wood structure or light steel keel, reinforcement measures shall be taken. If the pipe is laid on the wall of the protective wall and there is a concealed junction box, the opening of the junction box should be flush with the wall.

 

The wooden protective wall shall be fireproof. It can be coated with fireproof paint or fireproof material lining.

 

2. When the manufacturer of Ready Board fixes the electrical box on the concrete wall or brick wall, the concealed piping, concealed Ready Board and exposed piping shall be used. If there is a junction box, first clean the debris in the junction box, then straighten the wires, distinguish the branch and phase sequence, and bundle them according to the branch.

 

When the box is in the correct position, the end of the wire is introduced into the box or board, the end of the wire is stripped one by one, and then pressed on the appliance one by one. At the same time, the PE protective ground wire is pressed in an obvious place, and the box is adjusted to be flat. Just fix it.