Clean and maintain the Ready Board regularly
The operation of the Ready Board seems simple. In fact, if the operation is wrong, it will lead to equipment failure and even personal safety accidents. Sometimes, many operators think that the operation method is not correct. In fact, we do not fully know how to operate correctly.
If the Ready Board is operated improperly, serious accidents will occur. Next, the Ready Board manufacturer will take you to see how to operate the Ready Board correctly. When the Ready Board enters the power distribution state, the staff shall not pull the speed-up switch of the power panel at will, and the locking switch of the air circuit breaker shall not be used in non emergency situations.
When the generator in the Ready Board works, the marine engineers shall concentrate on the operation of the distribution board and operate carefully to prevent accidents, otherwise they will be investigated for personal responsibility. After the motor unit is started, it shall be accelerated manually and slowly by using the speed up switch of the power panel.
The generator can not be switched on until it enters the normal working state and the voltage and frequency reach the specified value. The parallel operation of generators shall be carried out in strict accordance with the requirements and regulations of parallel conditions, and attention shall be paid to reverse power (reverse current) and parallel failure.
The Ready Board operates normally, and no irrelevant person is allowed to pull the switch on the board. The Ready Board shall be cleaned and maintained regularly to keep the equipment in good working condition. When starting and stopping the generator, the load of the generator shall be cut off first, and then the generator shall be stopped without load. Direct shutdown with load is not allowed.