The acceptance process after the construction of the lighting electric ready board is a key link to ensure the normal operation and safe use of the lighting system. The following is a brief overview of the process:

Preparation stage: Before acceptance, the construction unit should ensure that the lighting electric ready board has been installed according to the design requirements, including the electric ready board body, internal components, wiring, etc. At the same time, technical documents during the construction process, such as construction drawings, construction records, material acceptance reports, etc., should be organized and submitted to the acceptance team.

On site inspection: The acceptance team should conduct an on-site inspection of the lighting electric ready board at the construction site, including whether the installation position, fixing method, wiring situation, labeling, etc. meet the design requirements and relevant standards.

Performance testing: Conduct performance testing on the lighting electric ready board, including insulation resistance testing, grounding resistance testing, leakage protection testing, etc., to ensure that all performance indicators of the electric ready board are qualified.

Document review: The acceptance team should review the technical documents during the construction process to ensure their completeness, accuracy, and consistency with the actual situation.

Rectification and Review: If any non-conforming items are found during the acceptance process, the acceptance team should provide rectification suggestions. After the construction unit makes the rectification, the acceptance team will conduct a review until it is qualified.

Issue acceptance report: After passing the acceptance, the acceptance team should issue an acceptance report, clarifying the acceptance results and rectification situation, and confirmed by the signatures of all parties.

Throughout the entire acceptance process, relevant standards and specifications should be strictly followed to ensure that the construction quality and safety performance of the lighting electric ready board meet the design requirements.